1. Analyse the reasons. Check the whole low temperature chiller system to confirm the cause of freezing damage and find out the leak point.
2. Blow dirt in sections.
(1) First, air compressor can be used to blow water (save nitrogen), until no water mist precipitate. Then blow with high pressure nitrogen, at the same time, heat the nitrogen (the nitrogen cylinder is prohibited from heating).
(2) Because the pipeline of low temperature chiller system is complex, water can be blown out in segments by using welding torch in some parts according to specific conditions.
(3) Heat and dry. The capillary, thermal expansion valve, compressor and other small components can be placed in the oven to bake and dry. Do replace the refrigerating oil in the compressor after the water is dried.
1. Vacuum drying
(1) Restore the pipeline and maintain the nitrogen pressure to ensure the air tightness of the system. Then connect the vacuum pump to the system for vacuum drying. (Dry filter barrel should be added to the front end of vacuum pump to avoid excessive water and gas entering the vacuum pump)
(2) In the process of vacuum drying, heat the place where water is easily stored in the pipeline, and the time can be determined according to the site.
2. Debugging and running.
(1) Make sure that the water in the system is basically removed.
(2) Connect the external drying filter barrel to the system and replace the desiccant after running for 5 minutes. At the same time, observe the operating parameters of the unit and pay attention to the sound of the compressor. If the dry filter is cold, the expansion valve frosts, and there is a pressure difference of more than 0.5 kg before and after the return air filter, stop the compressor immediately.
3. Completion of maintenance
(1) Remove the refrigerant pipe from the drying filter barrel and restore it.
(2) Check the supplementary refrigerant quantity. Turn on and check the machine running parameters to confirm normal.
Related recommendations
-
The Analysis Of Ultra Low Freezer’S Price
2229What are the characteristics and functions of ultra low freezer:1. Ultra low freezer can prevent the precision of machine equipment from being influenced by the change of oil temperature in the process of operation. 2. Ultra low freezer can preven...
View details -
Buy TCU-Multiple Reactor Cooling Heating Temperature Control System
2431Researchers who do research work know that during the laboratory experiments, TCU-multiple reactors are often used for cooling and heating temperature control systems or high and low temperature all-in-one machines, so TCU-multiple reactions that ...
View details -
Analytical description of accessories used in low temperature chiller
1694The low temperature chiller still uses a larger amount of cooling water equipment in our usual refrigeration equipment. When using it, you must first understand the principle of the low-temperature chiller and various accessories to better operate...
View details -
Configuration form of circulating heating unit for laboratory
1971The standard model of the circulating heating unit for LNEYA laboratory is: SUNDI, the temperature range is from room temperature to minus 120 degrees Celsius, and the capacity can be divided into 5L, 10L, 20L, 30L, 40L, 50L, 80L, 100L, larger cap...
View details
LNEYA Thermo Refrigeration Co.,Ltd