How to Solve the Problem of Water Supply in Low Temperature chiller system
Due to the improper operation of low temperature chiller system, there is the possibility of water entering into refrigerant system. Therefore, in view of the problem of water supply in low temperature chiller system, process guidance is formulated to serve as a reference for maintenance.
1. Analyse the reasons. Check the whole low temperature chiller system to confirm the cause of freezing damage and find out the leak point.
2. Blow dirt in sections.
(1) First, air compressor can be used to blow water (save nitrogen), until no water mist precipitate. Then blow with high pressure nitrogen, at the same time, heat the nitrogen (the nitrogen cylinder is prohibited from heating).
(2) Because the pipeline of low temperature chiller system is complex, water can be blown out in segments by using welding torch in some parts according to specific conditions.
(3) Heat and dry. The capillary, thermal expansion valve, compressor and other small components can be placed in the oven to bake and dry. Do replace the refrigerating oil in the compressor after the water is dried.
1. Vacuum drying
(1) Restore the pipeline and maintain the nitrogen pressure to ensure the air tightness of the system. Then connect the vacuum pump to the system for vacuum drying. (Dry filter barrel should be added to the front end of vacuum pump to avoid excessive water and gas entering the vacuum pump)
(2) In the process of vacuum drying, heat the place where water is easily stored in the pipeline, and the time can be determined according to the site.
2. Debugging and running.
(1) Make sure that the water in the system is basically removed.
(2) Connect the external drying filter barrel to the system and replace the desiccant after running for 5 minutes. At the same time, observe the operating parameters of the unit and pay attention to the sound of the compressor. If the dry filter is cold, the expansion valve frosts, and there is a pressure difference of more than 0.5 kg before and after the return air filter, stop the compressor immediately.
3. Completion of maintenance
(1) Remove the refrigerant pipe from the drying filter barrel and restore it.
(2) Check the supplementary refrigerant quantity. Turn on and check the machine running parameters to confirm normal.
Related recommendations
-
How to maintain stable performance of biopharmaceutical laboratory oil cooler?
18491. A suitable working environment to prevent various failures of the oil cooler in the biopharmaceutical laboratory needs to provide a better operating environment for the equipment. Keep the environment clean and tidy, reduce the impact of vario...
View details -
Disadvantages and advantages of general heat transfer oil heating circulation system
2323The heat conduction oil heating circulation system adopts a fully closed loop structure to directly act on the heat energy to the heated medium. Its advantages are: (1) Due to the continuous renewal of the heat transfer surface, the heat loss is s...
View details -
Another name for explosion-proof refrigerator: metal cold processing assembly box
2093Wuxi Guanya LNEYA explosion-proof refrigerator adopts single-machine self-folding cryogenic processing technology. It is made of SUS304 stainless steel wire plate with separate low-temperature box, horizontal low-temperature box, inner and outer b...
View details -
Application and working principle of water-cooled chiller
2022Application and working principle ofwater-cooled chillerThe water-cooled chiller is a kind of LNEYAindustrial low-temperature refrigerator in Wuxi Guanya. A single compressor canachieve -152 degrees Celsius cooling and cooling. Equipment power,...
View details
LNEYA Thermo Refrigeration Co.,Ltd