폐쇄 순환 냉각 시스템 디버깅 주의 사항
폐쇄 순환 냉각 시스템은 시운전 중에 몇 가지 일반적인 문제에주의를 기울여야합니다. 디버깅 작업을 잘 수행하십시오. LNEYA 제조업체는 사용자가 작업 할 준비가되었을 때만 더 나은 디버깅을 할 수 있음을 사용자에게 상기시킵니다. 준비 ...
The preparation work before the commissioning of the closed circulation cooling system is an important part of the debugging process, which may affect the progress of the whole debugging process. Generally, it is necessary to pay attention to the leakage detection of the air piping system, and there are detailed regulations on the leakage amount of the equipment. High, medium and low pressure systems, under different pressures, the air ducts have different air leakage per square meter per hour. The second is the visual inspection of the pipeline system. The main content of this work is to inspect the pipeline system to ensure that the various valves on the diffuser, branch pipe and main pipe are fully open to ensure that the pipeline system is in the all-pass state. Furthermore, the preparation of the closed loop cooling system commissioning equipment. Before commissioning, prepare the required test equipment, including the equipment required for testing temperature, humidity, pressure, speed, and speed. The preparation work is often different due to different piping systems and their pre-installation work. This should be noted in this.
It is a closed-loop cooling system. When the pump and the main unit are both turned on, the end-to-end end is used for commissioning, the valve for the end supply and return pipe that was originally turned off is turned on, and the water supply and discharge main pipe and main switch that are opened when the pipe is cleaned are turned off. The bypass valve on the circuit, see if the two-way valve is normal, if there is any problem in the closed circulating cooling system when there is abnormality, there is no electricity, or the coil of the valve has been burned. If the coil is burned, there is no spare part, the valve can be manually used. The switch forcibly opens the two-way valve for commissioning.

In actual work, the heating capacity of the closed circulation cooling system unit changes due to the difference in ambient temperature and the requirement of the winter hot water supply temperature in the refrigeration system. The heating capacity of the unit decreases with the increase of the hot water outlet temperature, and decreases with the decrease of the ambient temperature. The input power under the heating condition increases with the increase of the outlet temperature of the hot water, and decreases with the decrease of the ambient temperature. .
When installing a closed circulation cooling system, the corresponding valve opening adjustment can be performed on this basis, which is very helpful to improve the debugging speed and efficiency and reduce the commissioning cost. On the basis of this, the commissioning personnel continuously learn to continuously debug and make the closed circulation cooling system equipment achieve better running state.
관련 권장 사항
-
Heating and cooling system for chemical reaction kettle reaction process
1227In the process of chemical chemical reaction, material temperature is an important production process parameter. For example, in salt crystallization, solution separation, organic pigment and intermediate processing, temperature control is particu...
세부 정보 보기 -
아케마 2018에 참가하는 LNEYA
8782018년 6월 11일부터 15일까지 독일 프랑크푸르트 암 마인에서 열리는 공정 산업을 위한 세계 포럼 및 선도 전시회인 ACHEMA에 참가할 예정입니다(자세한 정보는 곧 공개될 예정입니다),
세부 정보 보기 -
판매용 냉판 냉동고 후 압축기 결함을 처리하는 방법은 무엇입니까?
948극저온 냉장고 냉동 시스템의 작동에서 압축기 고장이 발생하면 극저온 냉장고의 작동에 영향을 미칩니다. 그렇다면 컴프레서에 영향을 미치는 결함은 무엇일까요? 고객은 어떻게 해결합니까?
세부 정보 보기 -
Various reactors and materials use PLC temperature control system
1300The PLC temperature control system is used for the lifting and constant temperature control of glass reactors, metal reactors and bioreactors, especially for heat exothermic control in the reaction process. The heat transfer oil in the jacket of t...