산업용 냉각기의 자세한 작동 지침
The installation procedures of water
chiller include:
1. During installation, please check
whether the machine is damaged and select a suitable place for installation and
future maintenance. The site for installing the unit must be the floor or
installation pad, with a levelness within 6.4mm, and can bear the operating
weight of the unit.
2. The chiller shall be placed in the
machine room with room temperature of 4.4-43.3 ℃, and there shall be enough space around and above the unit for
daily maintenance.
3. At one end of the unit, a pipe
extraction space for cleaning the condenser tube bundle shall be reserved, and
door holes or other holes at appropriate positions can also be used.
4. Select water pipes with appropriate pipe
diameter, cooling system and cold water system when the unit operates at
maximum power, and connect them correctly.
5. For ordinary applications, the water
flow velocity through the evaporator and condenser is allowed to be between
1.0-3.6m/s.
6. The water flow shall be stable under any
load.
7. All cooling water pipes shall be
designed and installed according to the conventional method. The chilled water
pump shall be located on the inlet pipe of the chiller to ensure the positive
pressure and flow in the unit. When piping, damping pipes shall be set to
ensure proper elasticity, and prevent the water in the evaporator from being
drained when the water pump stops.
8. The pipeline shall be firmly supported
independent of the chiller to avoid stress on the components of the chiller.
9. In order to reduce noise and vibration,
it is better to install vibration isolator on the pipeline.
10. In order to use the chiller
economically and effectively, it is recommended to invite water treatment
experts to analyze the water supply quality of evaporator and condenser. Poor
water quality will cause scale, affect heat transfer, or produce corrosion
precipitation, affect the performance of the unit and increase operation and
maintenance costs.
11. Generally speaking, proper water
treatment and regular cleaning can maintain its good performance.
12. Please install a filter at the inlet of
the water pipe and clean it regularly.
13. After leak test, all nozzle openings
must be treated with rust prevention.
14. In order to facilitate daily
maintenance, the user can take some (or all) of the following measures: the
pressure gauge and stop valve with cock can be installed on the inlet and
outlet pipes of cooling water and chilled water, close to the chiller as far as
possible;
Lifting rails and beams can be erected
above the equipment to facilitate maintenance.
관련 권장 사항
-
Description of power consumption in LNEYA large refrigeration unit
1315In the process of operation, the cooling capacity and working conditions will affect the power consumption of the entire large refrigeration unit, but in order to avoid unnecessary power consumption, we need to understand the other power consumpti...
세부 정보 보기 -
Why do forging machines need to be equipped with cooling heating temperature control unit?
813The temperature control of the workpiece and mold is crucial during the working process of forging and stamping machines, especially during hot processing operations. The application of cooling, heating, and temperature control systems in forg...
세부 정보 보기 -
초저온 냉동 서큘레이터 콘덴서 유지보수 지침
1460유지 관리는 초저온 냉동 순환기 사용자에게 중요한 작업입니다. 우시 구아냐 엘네야는 콘덴서의 유지 보수가 유지 보수 작업에서 비교적 중요한 작업임을 상기시킵니다. 그렇다면 유지 관리를 위해 무엇에주의해야합니까?
세부 정보 보기 -
Solution to oil spill of reactor cooling and heating circulator
992When we use some reactor cooling and heating circulators, we will find that the system pressure fluctuates up and down as the temperature rises, and the oil tank is overflowing. So what are the reasons for these conditions in the cooling and heat...
세부 정보 보기