Ultra-low temperature freezer power supply and electronic control instrument system description
Ultra-low temperature freezer needs to be tested after a long time of use. What should be paid attention to when the power supply and electronic control instrument system are inspected?
Check the ultra-low temperature freezer power supply and the electronic control instrument system. Before starting the power, check whether the power distribution capacity matches the unit power, and whether the selected cable diameter can withstand the host operating current. Check whether the electrical system is consistent with the unit. The unit is electrically: three-phase five-wire system (three phase lines, one neutral line, one ground line, 380V ± 10%). Check if the power supply line of the compressor is connected tightly. If it is loose, retighten it. The torque at the compressor wiring is 500kg/cm. Due to factors such as long-distance transportation and lifting, the screws may be loose. Failure to do so may result in damage to electrical components (such as air switches, AC contactors, etc.) and compressors in the main control cabinet.
Use a multimeter to carefully check all the electrical circuits of the ultra-low temperature freezer, check that the wiring is properly installed in place; use megaohm measurement to make sure there is no short circuit in the case; check that the ground wire is properly installed in place, and the insulation resistance to ground is greater than 2MΩ; check if the power cable is suitable. Capacity requirements. Check if the disconnect switch is installed on the power supply line of the supply unit. All the wiring of the main circuit in the control cabinet and the external wiring of the control circuit can be energized after comprehensive inspection (such as crankcase oil heater, compressor electronic protector, circulating water temperature sensor, target flow switch wiring, pump connection) Control, etc.); Check if the terminal bolts are tightened and there is no looseness.
The performance of the power supply and the electronic control instrument are more important in the operation of the ultra-low temperature cold box, so regular inspection is recommended.
Related recommendations
-
Application field of LNEYA water heater circulator
2366Hot water circulation, this is a very good water heater device and is now used in many places. By using a hot water circulator, people can solve the problem of domestic hot water use. Today we will introduce some applications of hot water circulat...
View details -
Temperature control of dynamic temperature control system in process engineering
1959In the chemical industry, especially in process engineering, many processes are bound to a temperature, or can be supported by specific temperature control applications, thereby making efficiency higher. An example of the latter is continuous temp...
View details -
Meet at booth 6002 of Shanghai World Expo Hall【Testing Expo】9.14-9.16
343Exhibition name: Shanghai International Automobile Testing and Quality Control ExhibitionExhibition time: September 14-16, 2020Booth number: 6002Exhibition address: Shanghai World Expo Exhibition Hall, Hall 1,
View details -
Maintenance knowledge of 12HP (8.9kW) low temperature chiller
2443The user can arrange the operator to learn about the daily maintenance knowledge of the 12HP (8.9kW) low temperature chiller after purchase. It can not only improve the company's product quality, improve production efficiency, but also extend the ...
View details
LNEYA Thermo Refrigeration Co.,Ltd












