The Following Works Should Be Done Before Starting Industrial Chillers
2. For the compressor unit with water system, carefully check whether the cooling water system and chilled water system have water, and whether the water pressure is normal, whether the pipeline system of cooling water and chilled water is unblocked.
7. Check whether there is leakage in refrigerant system of industrial chiller and whether there is leakage in lubricating oil system.
Related recommendations
-
Lneya Semiconductor High Precision Temperature Control System Description
2747Semiconductor high-precision temperature control systems are currently produced in the semiconductor industry with highly complex performance. Here is a description of the semiconductor high-precision temperature control system. Along with large-s...
View details -
Semiconductor temperature test system application range description
3030The semiconductor temperature test system is LNEYA's new device for semiconductor chip testing. So what range does the semiconductor temperature test system apply? Users need to understand the specific application range to select the appropriate s...
View details -
What should I pay attention to when using the reactor for chilling and cooling?
2135When using the reactor chilling and cooling and cooling device, users need to pay attention to their refrigeration and heating operations. Pay attention to the operation within a reasonable temperature range to avoid excessive temperature and pres...
View details -
Temperature control instructions for stainless steel reactors and glass reactors
2410Reactor is a kind of reaction equipment in industrial production. It generally needs to be refrigerated or heated. Whether the temperature is suitable or not directly affects its reaction effect. Therefore, if conditions permit, it is generally e...
View details
LNEYA Thermo Refrigeration Co.,Ltd












