What are the installation requirements for lithography chillers?
In order to ensure the reliable and normal operation of the chiller of the lithography machine and prevent the failure of the chiller caused by improper water distribution pipeline construction, the following matters should be paid attention to when installing this unit.

Working Principle:
The heat flow cover isolates the test piece from the surrounding environment, and circulates the jet of gas. By accurately controlling the cold and hot air in a very short period of time, it provides accurate and fast ambient temperature for the test item.
Precautions for the power supply of the lithography machine chiller:
1. The power supply of the chiller for the lithography machine adopts three-phase four-wire, and the power line is connected to the live line, the neutral line and the ground line.
2. The perforation on the electric control box of the main power cord is connected to the post inside the box to ensure that the connection is tight.
3. Unit power distribution requirements: main power supply voltage: within the rated voltage range
4. When the main power supply voltage exceeds the fluctuation and exceeds the specified range, the chiller is not allowed to start, otherwise it will be regarded as improper operation, and the damage caused by this is not within the maintenance scope of our company.
5. The water flow switch, water pump, cooling tower motor and other interlock circuits of the water system can be correctly connected to the unit control circuit when necessary.
6. The chiller for lithography machine has no current overload protection, high and low pressure protection at the discharge end of the compressor, motor line overheat protection, anti-icing protection, interlocking protection of cooling water and other measures. Do not modify it without authorization, if necessary. Please contact the manufacturer for changes.

Precautions for installation of lithography machine chiller:
1. Lifting and installing the chiller for the lithography machine, take care not to damage the chiller, and arrange the space around the chiller for the lithography machine rationally to facilitate the maintenance of the chiller for the lithography machine.
2. In accordance with the requirements for piping system design, construction and installation, rationally design and install the freezing water and cooling water system to give full play to the performance of the chiller for the lithography machine.
3. The unit should be placed horizontally and installed in a ventilated location.
4. Select the matching cooling tower according to the cooling capacity of the unit.
5. For the piping of the unit, please refer to the piping method recommended by our company for installation and construction.
6. When the surrounding environment of the water source and the cooling water tower is bad, the chilled water and cooling water circuit must be equipped with Y-type filters and regularly cleaned. The higher part of the closed chilled water system must be installed with an automatic exhaust valve, and the lower part of the system must be installed with a drainage connector. For system drainage.
7. After the chilled water piping system has passed the leak test, it is covered with an insulating layer to avoid loss of cold capacity and dripping of the pipes.
The above is the relevant content compiled by the LNEYA article editor assistant. If you have any questions, please contact us sales@lneya.com
관련 권장 사항
-
Description of the principle and mode of industrial water chiller refrigeration cycle
1336Anyone who knows about industrial waterchillers should know that it uses compressors to achieve the cooling effect.So, how does it work when refrigerating?1. Vapor compression refrigeration cycle.After cooling and pressurizing the vaporfrom the...
세부 정보 보기 -
고온 및 저온 장치 관련 기기 유지보수 지침
1156The liquid medium should be added before the high and low temperature circulation device is used. The liquid medium generally uses more than 95% alcohol, and the liquid medium cannot be lower than the working plate 20mm. The high and low temperatu...
세부 정보 보기 -
Heat transfer oil cleaning instructions in the heat transfer oil secondary circulation system
1131The heat transfer oil secondary circulation system uses the heat transfer oil as the medium to carry out the refrigeration and heating temperature control. Then, when the user cleans the heat transfer oil in the heat transfer oil secondary circula...
세부 정보 보기 -
반도체 제조 공정 중 멀티채널 냉각기가 필요한 공정은 무엇입니까? 왜 필요한가요?
1020화학 기상 증착(CVD): CVD 공정에서는 다중 채널 냉각기를 사용하여 반응 챔버 벽, 열교환기 및 가스 예열 교환기를 냉각하여 안정적인 반응 챔버 온도를 유지하여 정밀한 제어를 보장합니다.
세부 정보 보기