Introduction To The Preparation Of Low Temperature Chiller’ Operation
Why do low temperature chiller need to be ready for operation? We must be very clear that only when we are ready to check the low temperature chiller can we run the equipment better, can we run it more efficiently.
Before running the low temperature chiller, we need to check the refrigerant, water and electrical equipment, and check the oil separator liquid level, the correct oil position should be in the oil mirror center line between the line.
Be careful to check that all the pressure gauges for the low temperature chiller are open, and whether the oil thermometer has been inserted with the lubricating oil, and check or open all the valves on the oil road that they should be completely open.
Push the start button, the low temperature chiller starts, and then wait to see whether the oil pump is turning correctly, the oil pressure difference is not low than the surface pressure of 0.05-0.3Mpa, and the pressure difference of the oil filter does not exceed 0.1Mpa. Turn the coupling and operate the energy control valve at the same time, so that the unloading indication goes from 0%–100%, then 100%–0%, then manually stop the oil pump.
Try low temperature chiller with hand disc compressor coupling, no card resistance phenomenon shows the normal state. Open the exhaust valve on the compressor, water supply to the oil cooler, and water temperature depends on the oil temperature (the nozzle oil temperature is better to be 40 –55 c). At the same time, water supply to the condenser and evaporator , finally cover the main motor power supply, and the power lamp is on, then the low temperature chiller can be used normally.
With these detailed preparations, it is certain that the low temperature chiller can be better used to achieve the lowest cost and maximum operational efficiency.
Related recommendations
-
What Should We Pay Attention to When Purchasing Suitable Low Temp Freezer?
1950Fresh keeping Although the low temp freezer is not simply a "food freezer", the core function is still fresh-keeping. For example, in order to keep tuna fresh, it is necessary to have a constant temperature and strong "freezing force" inside the u...
View details -
Does the chip lead bonding process require a temperature control system?
1798The chip lead bonding process indeed requires precise temperature control, so temperature control systems are usually equipped to ensure process stability and yield. The following are the importance and application scenarios of temperature control...
View details -
Analysis of Common Faults in New Energy Vehicle Power Battery Test System
1958If the new energy vehicle power battery pack leaks, the general fault manifestation mode: the meter OK light does not light, the meter prompts to check the power system, the high voltage system leakage fault, disconnect the battery pack and the bo...
View details -
CIPM China [C-48-2] welcomes new and old customers!
463The 58th (Fall 2019) National Pharmaceutical Machinery & China International Pharmaceutical Machinery Expo will be held at the Chongqing International Expo Center from November 5th to November 7th, 2019. It is recognized by the industry as pro...
View details
LNEYA Thermo Refrigeration Co.,Ltd