How to use multiple reactors for high and low temperature integrated machine
Multiple reactors high and low temperature integrated machine temperature control system will be connected with thermal conductive synthetic oil and power supply before use, and multiple reactor high and low temperature integrated machine temperature control system outlet port will be connected with the second field inlet, and the circulation device inlet port will be connected. It is connected to the second field exit to make it a closed loop system. Multiple reactors high and low temperature integrated machine temperature control system adopts three-phase five-wire system (three fire wires, one neutral wire, one ground wire) to connect the power supply, if the line continues to be wrong (the continuous protector indicator in the circuit) Red) Replace any two live locations until the phase protector indicator is green. Open the top cover of the filling port, add the heat transfer oil to the expansion oil level of the liquid storage tank (marked by the liquid level mirror), open and open the venting valve of the high temperature and low temperature integrated machine control system of multiple reaction kettles, and open the high and low temperature of multiple reaction kettles. Integral control system power supply, press the liquid button to start adding heat transfer oil to the system until there is liquid overflowing from the vent. Close the bleed valve, open the running button, set the temperature of the high temperature and low temperature control system of multiple reactors to 150 degrees, and continue to deflate and add liquid to the expansion position. Close the bleed valve, open the operation key of the high temperature and low temperature control system of multiple reactors, set the temperature to 25 degrees, continue to deflate and add liquid to the expansion position, and the test run is completed. The actual measured temperature is displayed when the microcomputer controller is powered up.
Multi-reactor high and low temperature integrated machine temperature control system parameter setting: press SET button, the upper row shows SP lower row as the required setting value, press the up or down button to reach the desired setting value, and then press the SET button Exit. Modify the internal parameters, press the SET button for more than 5 seconds, display the function menu, then click the SET button, press the LK to the password lock, and then press the up button to display the LK down button as 1. Click the SET button and press the desired parameter. Modify it in the same way. Press the SET button for more than 5 seconds. Turn on the power supply of the high temperature and low temperature control system of multiple reactors, set the required temperature, and press the running key switch.
How to use the high temperature and low temperature integrated machine temperature control system of many reactors, we need to take a closer look, Wuxi Guanya multi-reactor high and low temperature integrated machine temperature control system, using high-quality accessories, in the operation is more reliable.
Related recommendations
-
How to replace the scroll compressor of the impact tester model?
2720In terms of different impact tester models, the configuration is also somewhat different. Among them, special care should be taken when replacing the scroll is a compressor. If the replacement is not noticed, the impact tester cannot be used. The ...
View details -
The Effect of Heating Cooling Translator
1796The whole liquid circulation of the heating and cooling circulator is closed with the expansion vessel. The expansion vessel and the liquid circulation are adiabatic and do not participate in the liquid circulation. This is just a mechanical conne...
View details -
What are the functions of the reactor temperature control system?
1978The reactor temperature control system is equipped with various reactors for high and low temperature reflection of liquid and solid. The temperature control system of LNEYA reactor adopts fully closed circulation pipeline, which is efficient in o...
View details -
How to install -50 °C cryogenic unit manufacturers equipment?
2333-50 °C cryogenic units are used in the refrigeration and chemical industry, so what issues should be paid attention to during installation? LNEYA professional manufacturers tell you that you should install according to the instruction manual. For...
View details
LNEYA Thermo Refrigeration Co.,Ltd












