LNEYA ultra-low temperature cold box power supply+electronic control instrument system description
LNEYA ultra-low temperature cold box needs to be tested after a long time of use. What should be paid attention to when the power supply and electronic control instrument system are inspecting?
LNEYA ultra-low temperature cold box power supply and electronic control instrument system inspection, before power-on should check whether the distribution capacity and unit power are consistent, whether the selected cable diameter can withstand the host operating current. Check whether the electrical system is consistent with the unit. The unit is electrically: three-phase five-wire system (three phase lines, one neutral line, one ground line, 380V ± 10%). Check if the power supply line of the compressor is connected tightly. If it is loose, retighten it. The torque at the compressor wiring is 500kg/cm. Due to factors such as long-distance transportation and lifting, the screws may be loose. Failure to do so may result in damage to electrical components (such as air switches, AC contactors, etc.) and compressors in the main control cabinet.
Use a multimeter to carefully inspect all electrical circuits of the LNEYA ultra-low temperature cold box, check that the wiring is properly installed in place; use megaohm measurement to make sure there is no short circuit in the case; check that the ground wire is properly installed in place, and the insulation resistance to ground is greater than 2MΩ; check if the power cable is Meet the capacity requirements. Check if the disconnect switch is installed on the power supply line of the supply unit. All the wiring of the main circuit in the control cabinet and the external wiring of the control circuit can be energized after comprehensive inspection (such as crankcase oil heater, compressor electronic protector, circulating water temperature sensor, target flow switch wiring, pump connection) Control, etc.); Check if the terminal bolts are tightened and there is no looseness.
The performance of the power supply and the electronic control instrument are more important in the operation of the LNEYA ultra-low temperature cold box, so it is necessary to check the recommendations regularly.
Related recommendations
-
Hot and cold rapid temperature change test chamber common fault
2105In the high-temperature test of the hot and cold rapid temperature change test chamber, once the temperature change does not reach the test temperature value, in this case, the electrical system can be inspected and the faults can be eliminated on...
View details -
LNEYA closed cycle refrigerator maintenance instructions
2015LNEYA closed cycle refrigerators should start to pay attention to their maintenance work after a long time of use, then how to carry out maintenance work? How to do maintenance work for it? According to the specific use environment and the frequen...
View details -
Operation instructions for cooling and heating system of reactor
2240The reactor cold and hot switching integrated machine is a cooling and heating temperature control equipment applied in various industries. How much do you know about the reactor cold and hot switching integrated machine? In the pharmaceutical, ...
View details -
LNEYA star refrigeration heating system SUNDI-320/420W/430W
2319Today, I will introduce the model of LNEYA's refrigeration heating system: SUNDI-320/420W/430W. It has three kinds of medium temperature range: -30°C~180°C; -40°C~180°C; -40°C~200°C. The control system is programmed to program up to 10 programs...
View details
LNEYA Thermo Refrigeration Co.,Ltd












